Training Sessions
Introduction – 7 minutes Identifies the basic tasks that are involved in most distribution line replacement jobs.
Poletop Preparation – 13 minutes Describes a procedure for preparing poletops for a reconductoring job so sufficient clearances are maintained when pulling in new conductors.
Installing Pulling Ropes – 8 minutes Describes a procedure for setting up a pulling rig and a tensioner. Describes a procedure for installing pulling ropes.
Installing Conductors – 8 minutes Describes a procedure for grounding conductors as they are pulled in. Describes a procedure for installing conductors.
Energizing Conductors – 8 minutes Describes a procedure for energizing new conductors. Describes a procedure for transferring the load from an old line to a new line.
Removing Conductors – 11 minutes Describes a procedure for isolating and removing conductors.
|