Get the Study Guide for this video

Follow the video session-by-session with this handy book. Color illustrations throughout. $15

Details
Instructor Guide  available

Distribution Line Replacement - DVD

$ 195.00

Summary

This 55-minute DVD explains how to replace existing line conductors with new conductors. The situation described is one that often occurs when it is necessary to increase the size of the conductors in a line. It demonstrates how to install temporary crossarms, pull and sag the new conductors, parallel them with the existing conductors, and remove the old conductors. The importance of maintaining the proper clearances and the importance of maintaining the integrity of the existing line are explained. Safety is emphasized throughout the unit.

Training Sessions

Training Sessions Introduction – 7 minutes
Identifies the basic tasks that are involved in most distribution line replacement jobs.

Poletop Preparation – 13 minutes
Describes a procedure for preparing poletops for a reconductoring job so sufficient clearances are maintained when pulling in new conductors.

Installing Pulling Ropes – 8 minutes
Describes a procedure for setting up a pulling rig and a tensioner. Describes a procedure for installing pulling ropes.

Installing Conductors – 8 minutes
Describes a procedure for grounding conductors as they are pulled in. Describes a procedure for installing conductors.

Energizing Conductors – 8 minutes
Describes a procedure for energizing new conductors. Describes a procedure for transferring the load from an old line to a new line.

Removing Conductors – 11 minutes
Describes a procedure for isolating and removing conductors.

Item Code: DLR-DVD