Training Sessions
Care and Maintenance of Hotline Tools - 32 minutes How to maintain hotline tools so the tools will retain their protective capabilities.
Hotstick Maintenance of 69kV Suspension - 25 minutes How to replace suspension insulators on an energized 69 kV line. The linemen use hotsticks for protection.
Pole Replacement Hotstick Method - 40 minutes How to move conductors from an old pole to a new pole. The linemen use hotsticks for protection and work from a bucket truck.
Distribution Line Maintenance - 15 minutes How to replace an insulator using a temporary conductor support. The linemen use rubber gloves for protection and work from a bucket truck.
Reconductoring or Upgrading Voltage with Extension Arms from an Aerial Device - 22 minutes How to move conductors out of the way so new conductors can be installed on new insulators upgraded. The linemen use a temporary extension arm, and work from a bucket truck.
Pole Replacement Rubber Glove Method from Aerial Device - 40 minutes How to move conductors from an old pole to a new pole. The linemen use rubber gloves for protection and work from a bucket truck.
Cutting in a Disconnect Switch Rubber Glove Method -33 minutes How to install a disconnect switch on a three-phase circuit.
|