Linework (Hubbell Power Systems) - Watch Instant Video

Training Sessions

Care and Maintenance of Hotline Tools - 32 minutes
How to maintain hotline tools so the tools will retain their protective capabilities.

Hotstick Maintenance of 69kV Suspension - 25 minutes
How to replace suspension insulators on an energized 69 kV line. The linemen use hotsticks for protection.

Pole Replacement Hotstick Method - 40 minutes
How to move conductors from an old pole to a new pole. The linemen use hotsticks for protection and work from a bucket truck.

Distribution Line Maintenance - 15 minutes
How to replace an insulator using a temporary conductor support. The linemen use rubber gloves for protection and work from a bucket truck.

Reconductoring or Upgrading Voltage with Extension Arms from an Aerial Device - 22 minutes
How to move conductors out of the way so new conductors can be installed on new insulators upgraded. The linemen use a temporary extension arm, and work from a bucket truck.

Pole Replacement Rubber Glove Method from Aerial Device - 40 minutes
How to move conductors from an old pole to a new pole. The linemen use rubber gloves for protection and work from a bucket truck.

Cutting in a Disconnect Switch Rubber Glove Method -33 minutes
How to install a disconnect switch on a three-phase circuit.