Training Sessions
Removal – 13 minutes Describes how to: select, inspect, and properly use appropriate safety equipment, de-energize and disconnect a single-phase poletop distribution transformer when service is to be interrupted, dismount and remove a single-phase poletop distribution transformer, use blocks and a truck-mounted winch.
Installation – 12 minutes Explains how to: use blocks and a truck-mounted winch, install a single-phase poletop distribution transformer with direct pole mounts, connect a single-phase poletop distribution transformer with the secondary bus de-energized, energize a newly installed poletop transformer, test a newly installed poletop transformer.
Phasing and Tying: Removal – 7 minutes Shows how to: temporarily tie in a secondary distribution bus with a nearby poletop transformer to maintain customer service during transformer replacement, safely de-energize and disconnect a completely self-protected poletop distribution transformer when customer service is not to be interrupted.
Phasing and Tying: Installation – 10 minutes Explains how to: use a boom crane to rig, lift, dismount, and mount a single-phase poletop transformer; connect and phase-in a poletop distribution transformer to an energized three-wire single-phase secondary bus.
Three-Phase Banks: Removal – 8 minutes Shows how to safely de-energize and disconnect one transformer in a three-phase bank without interrupting customer service. How to remove a cluster-mounted poletop transformer.
Three-Phase Banks: Installation – 9 minutes Demonstrates how to install a single-phase poletop distribution transformer in a cluster-mount application. Shows how to safely connect, energize, and test a transformer in a three-phase bank while the secondary bus is energized.
|