Rigging for High Voltage Work - Watch Instant Video

Training Sessions

High-Voltage Rigging Basics
Vertical Insulator Changeout: Tailgate Session
Vertical Insulator Changeout
Inside V insulator Changeout
Running Corner Insulator Changeout
Spar Arm Replacement
Training Sessions

High-Voltage Rigging Basics – 14 minutes
Defines safe working distance as it applies to working around high-voltage components. Defines load control as it applies to rigging for high-voltage work. Describes the three basic stages of a high-voltage maintenance or repair job. Describes some of the basic rigging tools used for rigging around high-voltage equipment.

Vertical Insulator Changeout: Tailgate Session – 7 minutes
Describes the equipment placement and rigging that can be used to safely change out a vertical string of insulators on a wooden spar structure. Describes the tasks involved and the sequence of operations necessary to rig for a vertical insulator changeout.

Vertical Insulator Changeout – 9 minutes
Demonstrates the rigging techniques involved in safely changing out a vertical string of insulators on a wooden spar structure.

Inside V insulator Changeout – 8 minutes
Describes the equipment placement and rigging necessary to safely change out a string of insulators in an inside V on a concrete H structure. Describes the tasks involved and the sequence of operations necessary to accomplish the changeout.

Running Corner Insulator Changeout – 7 minutes
Describes the equipment placement and rigging necess
ary to safely change out a string of insulators on a running corner. Describes the tasks involved and the sequence of operations to accomplish the changeout.

Spar Arm Replacement – 11 minutes
Describes the equipment placement and rigging necessary to safely replace a spar arm on a wooden spar structure. Describes the tasks involved and the sequence of operations to accomplish the spar arm replacement.