Testing Single-Phase Transformer-Rated Meters – Watch Instant Video

Training Sessions

Meter Installation Review
Equipment, Tests, and Calculations
Field Test Connections
Field Testing and Calibrating
Training Sessions

Meter Installation Review – 5 minutes States the functions of a transformer-rated meter installation. Identifies and describes the functions of the following transformer-rated meter installation components: transformer-rated meter, current transformer, voltage transformer, test switch. Describes how the components of a transformer-rated meter installation can be connected.

Equipment, Tests, and Calculations – 10 minutes Identifies and describes equipment used to field test single-phase transformer-rated meters. Shows tests typically used to field test single-phase transformer-rated meters. Includes examples of calculations needed to field test a single-phase transformer-rated meter.

Field Test Connections – 7 minutes Describes preparations for making field test connections to a single-phase transformer-rated meter. How to conduct a creep check on a single-phase transformer-rated meter. How to connect a standard, a phantom load, and a test switch to field test a single-phase transformer-rated meter.

Field Testing and Calibrating – 10 minutes How to field test and calibrate a single-phase, transformer-rated meter.